05 Let's make a WBS๏ผˆWork Breakdown Structure๏ผ‰

Published: Feb. 17, 2026, 3:02 p.m. UTC / Updated: Feb. 18, 2026, 2:01 a.m. UTC
๐Ÿ‘ 0
๐Ÿ”– 0 Bookmarks
English

ChatGPT_Image_2026ๅนด2ๆœˆ18ๆ—ฅ_11_00_04

WBS (Work Breakdown Structure)

Project management made incredibly simple.

Creating a WBS (Work Breakdown Structure) used to require Excel or MS Project. With PinotWalk, it's all done in your browser.
With intuitive drag-and-drop operations, anyone can create a professional project plan in just 5 minutes.


๐Ÿ“Š What is WBS?

Work Breakdown Structure is a methodology for breaking down projects into smaller tasks and managing them hierarchically.

Why Do You Need WBS?

  • โœ… Visualize Progress: See task completion status at a glance
  • โœ… Prevent Oversights: Breaking down the whole prevents missed tasks
  • โœ… Clear Role Assignment: Manage who does what by when in one view
  • โœ… Schedule Management: Visualize timelines with Gantt charts

PinotWalk WBS Features

Feature Description Difference from Traditional Tools
๐Ÿš€ Incredibly Easy Edit cells like Excel No complex setup like MS Project
๐Ÿ’ผ Professional Grade Compliant with enterprise PMO standards Consultant-quality output
๐Ÿ“ˆ Built-in Gantt Chart Schedules automatically visualized Excel requires manual drawing
๐ŸŒ Open Format Saved as .wbs (JSON) No vendor lock-in
๐Ÿ‘ฅ Team Sharing All Space members can view in real-time No more email attachments

๐ŸŽฏ What You Can Do

โœ… Basic WBS Functions

  • Hierarchical Task Management (Parent Task โ†’ Child Task โ†’ Grandchild Task...)
  • 13 Column Types (Text, Date, User, Status, Progress Rate, Hours, etc.)
  • Status Management (Not Started / In Progress / Completed / Blocked)
  • Progress Visualization (Progress bar display)
  • Assignee Assignment (User selection available)

โœ… Gantt Chart (Calendar View)

  • Parallel Display of Planned and Actual
  • Automatic Calendar Range Calculation (Earliest start to latest end date)
  • Two-tier Month/Day Header (YYYY-MMM format)
  • Task Bar Visualization (Light blue = Planned, Dark color = Actual)
  • Milestone Display (Highlight important milestones)

๐Ÿ“ค Creating a WBS File

  • Creating a WBS means you probably have a project and are involved in its management.
  • You'll likely create a Team to centrally manage the project and a Space for planning and managing the WBS and other project activities.
  • On the Space screen, you'll find the [+WBS] button right next to the Files title on the left side.
  • This button opens up the world of WBS!

How to: Create a New WBS

  1. Navigate to the Space Page

    • Team detail page โ†’ Spaces tab โ†’ Click on your target Space
  2. Open the Files Tab

    • Click on the "Files" tab
  3. Click "+WBS"

    • Once the WBS opens, you can start editing in an Excel-like interface.

๐Ÿ“Š How to Use the WBS Viewer

Basic Screen Layout

โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚  WBS: Project Name                           ๐Ÿ“Š Stats Panel   โ”‚
โ”‚  โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”‚
โ”‚                                                                โ”‚
โ”‚  โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”ฌโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ” โ”‚
โ”‚  โ”‚Task Name โ”‚Statusโ”‚Owner โ”‚Start   โ”‚End   โ”‚ Gantt Chart     โ”‚ โ”‚
โ”‚  โ”œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ผโ”€โ”€โ”€โ”€โ”€โ”€โ”ผโ”€โ”€โ”€โ”€โ”€โ”€โ”ผโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ผโ”€โ”€โ”€โ”€โ”€โ”€โ”ผโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ค โ”‚
โ”‚  โ”‚ โ–ผ Phase1 โ”‚Done  โ”‚Yamadaโ”‚01/15   โ”‚02/28 โ”‚โ– โ– โ– โ– โ– โ– โ– โ– โ– โ– โ”‚ โ”‚
โ”‚  โ”‚   Req.Defโ”‚Done  โ”‚Suzukiโ”‚01/15   โ”‚01/31 โ”‚ โ– โ– โ– โ–           โ”‚ โ”‚
โ”‚  โ”‚   Design โ”‚Done  โ”‚Sato  โ”‚02/01   โ”‚02/28 โ”‚      โ– โ– โ– โ– โ– โ– โ”‚ โ”‚
โ”‚  โ”‚ โ–ผ Phase2 โ”‚WIP   โ”‚Tanakaโ”‚03/01   โ”‚05/31 โ”‚          โ–ˆโ–ˆโ–ˆโ–ˆ  โ”‚ โ”‚
โ”‚  โ”‚   Dev    โ”‚WIP   โ”‚Takahaโ”‚03/01   โ”‚04/30 โ”‚          โ– โ– โ–   โ”‚ โ”‚
โ”‚  โ”‚   Test   โ”‚To Do โ”‚Watanaโ”‚05/01   โ”‚05/31 โ”‚                โ”‚ โ”‚
โ”‚  โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ดโ”€โ”€โ”€โ”€โ”€โ”€โ”ดโ”€โ”€โ”€โ”€โ”€โ”€โ”ดโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”ดโ”€โ”€โ”€โ”€โ”€โ”€โ”ดโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜ โ”‚
โ””โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”˜

Stats Panel

Displays an overview of the entire WBS:

  • Total Tasks: Total number of tasks
  • Root Tasks: Number of top-level tasks (tasks without a parent)
  • Max Depth: Depth of hierarchy (maximum number of levels)
  • Columns: Number of columns

Tree View Operations

Expand/Collapse Tasks

  • Click โ–ผ button โ†’ Show/hide child tasks
  • Expand All โ†’ Click "Expand All" button at the top
  • Collapse All โ†’ Click "Collapse All" button at the top

Status Badges

Task status is displayed with colors:

Status Display Color
Completed COMPLETED ๐ŸŸข Green
In Progress IN_PROGRESS ๐ŸŸ  Orange
Not Started NOT_STARTED โšช Gray
Blocked BLOCKED ๐Ÿ”ด Red

Progress Bar

Task progress is displayed visually:

0%    โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘ (empty)
25%   โ–ˆโ–ˆโ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘ (light blue bar)
50%   โ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–‘โ–‘โ–‘โ–‘โ–‘
75%   โ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–‘โ–‘โ–‘
100%  โ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆ (dark bar)

๐Ÿ“… Gantt Chart Features

Calendar View

Two-Row Header Structure

โ”Œโ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”
โ”‚         2026-Jan          โ”‚         2026-Feb          โ”‚
โ”œโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ผโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ฌโ”€โ”€โ”ค
โ”‚ 1โ”‚ 2โ”‚ 3โ”‚ 4โ”‚ 5โ”‚...โ”‚30โ”‚31โ”‚ โ”‚ 1โ”‚ 2โ”‚ 3โ”‚ 4โ”‚...โ”‚27โ”‚28โ”‚ โ”‚
โ””โ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”ดโ”€โ”€โ”˜
  • Row 1: Month header (YYYY-MMM format, e.g., 2026-Jan)
  • Row 2: Dates (1โ€“31)

Understanding Task Bars

Planned and Actual shown in parallel:

Planned:  โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘โ–‘  (light color, top row)
Actual:       โ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆโ–ˆ  (dark color, bottom row)
  • Top row (light color): Planned period (Planned Start โ€“ Planned Due)
  • Bottom row (dark color): Actual period (Actual Start โ€“ Actual Due)

Visualizing Delays:

  • Actual bar exceeds Planned โ†’ Delay detected (shown in red)
  • Actual bar within Planned โ†’ On track (shown in green)

Zoom Level

Switch the Gantt chart display granularity:

  • Day: Daily view (default)
  • Week: Weekly aggregated view
  • Month: Monthly aggregated view

๐ŸŽจ Customizing Columns

Default Columns (13 Types)

PinotWalk WBS comes with 13 standard columns based on project management best practices:

ใ‚ซใƒฉใƒ ๅ ๅž‹ ่ชฌๆ˜Ž
WBS No. text WBS number (e.g., 1.1.1)
Task Name text Task name (required)
Status select Status (Not Started / In Progress / Completed / Blocked)
Owner user Assignee
Team team Team in charge
Planned Start date Planned start date
Planned Due date Planned end date
Actual Start date Actual start date
Actual Due date Actual end date
Planned Hours number Planned hours
Actual Hours number Actual hours
Progress number Progress (0โ€“100%)
Notes textarea Notes/remarks

Adding Columns (Coming Soon)

You can add custom columns:

  • Budget column (currency): { type: "currency", currency: "JPY" }
  • Priority (select): { type: "select", options: ["High", "Medium", "Low"] }
  • URL (url): { type: "url" }
  • Email (email): { type: "email" }

๐Ÿ’ก Use Cases

Software Development Project

ใ€Phase 1ใ€‘Requirements & Design
  โ”œโ”€ User Interviews
  โ”œโ”€ Requirements Document
  โ”œโ”€ System Design
  โ””โ”€ Database Design
ใ€Phase 2ใ€‘Development
  โ”œโ”€ Backend Development
  โ”‚   โ”œโ”€ API Design
  โ”‚   โ”œโ”€ Authentication
  โ”‚   โ””โ”€ Database Setup
  โ”œโ”€ Frontend Development
  โ”‚   โ”œโ”€ UI/UX Design
  โ”‚   โ”œโ”€ Component Implementation
  โ”‚   โ””โ”€ Screen Navigation
  โ””โ”€ Infrastructure Setup
ใ€Phase 3ใ€‘Testing & Release
  โ”œโ”€ Unit Testing
  โ”œโ”€ Integration Testing
  โ”œโ”€ User Acceptance Testing
  โ””โ”€ Production Release

Construction Project

ใ€Phase 1ใ€‘Basic Design
  โ”œโ”€ Geological Survey
  โ”œโ”€ Architectural Design
  โ””โ”€ Structural Design
ใ€Phase 2ใ€‘Construction
  โ”œโ”€ Foundation Work
  โ”œโ”€ Structural Work
  โ”œโ”€ Interior Work
  โ””โ”€ Facility Installation
ใ€Phase 3ใ€‘Inspection & Handover
  โ”œโ”€ Completion Inspection
  โ”œโ”€ Remediation Work
  โ””โ”€ Handover

Research Project

ใ€Phase 1ใ€‘Literature Review
ใ€Phase 2ใ€‘Experiment Planning
  โ”œโ”€ Experiment Design
  โ”œโ”€ Material Procurement
  โ””โ”€ Preliminary Experiment
ใ€Phase 3ใ€‘Main Experiment
  โ”œโ”€ Data Collection
  โ”œโ”€ Data Analysis
  โ””โ”€ Result Verification
ใ€Phase 4ใ€‘Paper Writing
  โ”œโ”€ First Draft
  โ”œโ”€ Peer Review Response
  โ””โ”€ Final Submission

๐Ÿš€ Pro Tips

Tip 1: Automatic WBS Numbering

WBS numbers (e.g., 1.1.1) are automatically generated from the hierarchy.

1. Phase 1                  โ†’ WBS No. = "1"
  1.1 Requirements          โ†’ WBS No. = "1.1"
    1.1.1 Interviews        โ†’ WBS No. = "1.1.1"
    1.1.2 Spec Document     โ†’ WBS No. = "1.1.2"
  1.2 Design              โ†’ WBS No. = "1.2"
2. Phase 2              โ†’ WBS No. = "2"

No manual setup required.

Tip 2: Identify the Critical Path

Use the Gantt chart to find the sequence of tasks with zero slack.

  • Work backwards from the final deadline to identify "if this task slips, the whole project slips"
  • Watch for tasks where Actual bar exceeds Planned

Tip 3: Use in Progress Meetings

Share WBS in weekly progress meetings:

  1. Completed tasks โ†’ Change to โœ… COMPLETED
  2. In-progress tasks โ†’ ๐ŸŸ  IN_PROGRESS, update Progress %
  3. Delayed tasks โ†’ Reset Actual Due, add reason in Notes
  4. Blocked tasks โ†’ Change to ๐Ÿ”ด BLOCKED, note the cause

Auto-saves after the meeting โ€” no need to write meeting minutes.

Tip 4: Filter by Owner

Coming soon:

  • Filter by "Owner = Yamada"
  • Display task list per assignee

๐Ÿ”’ Access Control

Permissions

WBS files are accessible only to Space members.

  • Space Member (MEMBER): View & edit
  • Space Viewer (VIEWER): View only
  • Space Admin (ADMIN): Full access (including delete)

Sharing with Team

  1. Go to Space details โ†’ "Members" tab
  2. Click "Add Member"
  3. Select the user to add
  4. Choose role (ADMIN / MEMBER / VIEWER)
  5. Done

๐Ÿ“Š Why Use PinotWalk WBS?

โŒ Problems with Traditional Tools

Tool Issues
Excel ใƒปGantt charts require manual drawing
ใƒปVersion control is chaotic (email attachment hell)
ใƒปNo simultaneous multi-user editing
MS Project ใƒปExpensive (USD 700+/year)
ใƒปComplex UI (steep learning curve)
ใƒปCloud sharing is inconvenient
Asana/Trello ใƒปNot WBS format (Kanban style)
ใƒปWeak hierarchical structure
ใƒปGantt charts only in paid plans

โœ… PinotWalk WBS Advantages

Feature Benefit
๐Ÿ†“ Completely Free No additional charges, all features available
๐Ÿš€ Ready in 5 Minutes No complex setup, drag & drop to start immediately
๐Ÿ’ผ Professional Grade 13 columns compliant with enterprise PMO standards
๐ŸŒ Access Anywhere Works in browser only, no installation required
๐Ÿ‘ฅ Real-time Sharing All team members can view and discuss the same screen
๐Ÿ”“ Open Format .wbs (JSON) format, easily migrate to other tools in the future
๐Ÿ“ˆ Auto-generated Gantt Chart Just enter dates, visualization is automatic

๐Ÿ”ง Troubleshooting

Q1: Gantt Chart Not Displaying

Cause:

  • Start date and end date are not entered

Solution:

  1. Enter "Planned Start" and "Planned Due" for at least one task
  2. Reload the page

Q2: File Size Too Large to Upload

Limit:

  • WBS file: Up to 10MB

Solution:

  • Delete unnecessary sheets
  • Remove images and charts
  • Split the project into multiple WBS files

For Users

For Developers

Open Source

  • .wbs Format Specification: To be released under MIT License
  • wbs-format Library: To be distributed on PyPI (pip install wbs-format)
  • wbs-editor Component: To be distributed on npm (npm install wbs-editor)

๐Ÿ’ฌ Feedback

If you have any opinions or requests about the WBS feature:

  1. Submit via the "Feedback" function within PinotWalk
  2. Consult your team administrator

Your feedback will be reflected in future updates.


ๆœ€็ต‚ๆ›ดๆ–ฐ: 2026-02-14


๐ŸŽ“ Summary

With PinotWalk WBS, project management becomes incredibly simple.

โœ… Ready in 5 minutes with intuitive operations
โœ… Professional grade 13 columns & Gantt chart
โœ… Completely free, no additional charges
โœ… Share with your entire team

Let's get started now!

  1. Navigate to the Space page
  2. Open the "Files" tab
  3. Just upload an Excel file โ€” let WBS lead your project to success.