WBS (Work Breakdown Structure)
Project management made incredibly simple.
Creating a WBS (Work Breakdown Structure) used to require Excel or MS Project. With PinotWalk, it's all done in your browser.
With intuitive drag-and-drop operations, anyone can create a professional project plan in just 5 minutes.
📊 What is WBS?
Work Breakdown Structure is a methodology for breaking down projects into smaller tasks and managing them hierarchically.
Why Do You Need WBS?
- ✅ Visualize Progress: See task completion status at a glance
- ✅ Prevent Oversights: Breaking down the whole prevents missed tasks
- ✅ Clear Role Assignment: Manage who does what by when in one view
- ✅ Schedule Management: Visualize timelines with Gantt charts
PinotWalk WBS Features
| Feature | Description | Difference from Traditional Tools |
|---|---|---|
| 🚀 Incredibly Easy | Edit cells like Excel | No complex setup like MS Project |
| 💼 Professional Grade | Compliant with enterprise PMO standards | Consultant-quality output |
| 📈 Built-in Gantt Chart | Schedules automatically visualized | Excel requires manual drawing |
| 🌐 Open Format | Saved as .wbs (JSON) |
No vendor lock-in |
| 👥 Team Sharing | All Space members can view in real-time | No more email attachments |
🎯 What You Can Do
✅ Basic WBS Functions
- Hierarchical Task Management (Parent Task → Child Task → Grandchild Task...)
- 13 Column Types (Text, Date, User, Status, Progress Rate, Hours, etc.)
- Status Management (Not Started / In Progress / Completed / Blocked)
- Progress Visualization (Progress bar display)
- Assignee Assignment (User selection available)
✅ Gantt Chart (Calendar View)
- Parallel Display of Planned and Actual
- Automatic Calendar Range Calculation (Earliest start to latest end date)
- Two-tier Month/Day Header (YYYY-MMM format)
- Task Bar Visualization (Light blue = Planned, Dark color = Actual)
- Milestone Display (Highlight important milestones)
📤 Creating a WBS File
- Creating a WBS means you probably have a project and are involved in its management.
- You'll likely create a Team to centrally manage the project and a Space for planning and managing the WBS and other project activities.
- On the Space screen, you'll find the [+WBS] button right next to the Files title on the left side.
- This button opens up the world of WBS!
How to: Create a New WBS
-
Navigate to the Space Page
- Team detail page → Spaces tab → Click on your target Space
-
Open the Files Tab
- Click on the "Files" tab
-
Click "+WBS"
- Once the WBS opens, you can start editing in an Excel-like interface.
📊 How to Use the WBS Viewer
Basic Screen Layout
┌────────────────────────────────────────────────────────────────┐
│ WBS: Project Name 📊 Stats Panel │
│ ─────────────────────────────────────────────────────────────│
│ │
│ ┌──────────┬──────┬──────┬────────┬──────┬─────────────────┐ │
│ │Task Name │Status│Owner │Start │End │ Gantt Chart │ │
│ ├──────────┼──────┼──────┼────────┼──────┼─────────────────┤ │
│ │ ▼ Phase1 │Done │Yamada│01/15 │02/28 │■■■■■■■■■■│ │
│ │ Req.Def│Done │Suzuki│01/15 │01/31 │ ■■■■ │ │
│ │ Design │Done │Sato │02/01 │02/28 │ ■■■■■■│ │
│ │ ▼ Phase2 │WIP │Tanaka│03/01 │05/31 │ ████ │ │
│ │ Dev │WIP │Takaha│03/01 │04/30 │ ■■■ │ │
│ │ Test │To Do │Watana│05/01 │05/31 │ │ │
│ └──────────┴──────┴──────┴────────┴──────┴─────────────────┘ │
└────────────────────────────────────────────────────────────────┘
Stats Panel
Displays an overview of the entire WBS:
- Total Tasks: Total number of tasks
- Root Tasks: Number of top-level tasks (tasks without a parent)
- Max Depth: Depth of hierarchy (maximum number of levels)
- Columns: Number of columns
Tree View Operations
Expand/Collapse Tasks
- Click ▼ button → Show/hide child tasks
- Expand All → Click "Expand All" button at the top
- Collapse All → Click "Collapse All" button at the top
Status Badges
Task status is displayed with colors:
| Status | Display | Color |
|---|---|---|
| Completed | COMPLETED | 🟢 Green |
| In Progress | IN_PROGRESS | 🟠 Orange |
| Not Started | NOT_STARTED | ⚪ Gray |
| Blocked | BLOCKED | 🔴 Red |
Progress Bar
Task progress is displayed visually:
0% ░░░░░░░░░░ (empty)
25% ██░░░░░░░░ (light blue bar)
50% █████░░░░░
75% ███████░░░
100% ██████████ (dark bar)
📅 Gantt Chart Features
Calendar View
Two-Row Header Structure
┌────────────────────────────────────────────────────────┐
│ 2026-Jan │ 2026-Feb │
├──┬──┬──┬──┬──┬──┬──┬──┬──┼──┬──┬──┬──┬──┬──┬──┬──┬──┤
│ 1│ 2│ 3│ 4│ 5│...│30│31│ │ 1│ 2│ 3│ 4│...│27│28│ │
└──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┴──┘
- Row 1: Month header (YYYY-MMM format, e.g., 2026-Jan)
- Row 2: Dates (1–31)
Understanding Task Bars
Planned and Actual shown in parallel:
Planned: ░░░░░░░░░░░░░░ (light color, top row)
Actual: ██████████ (dark color, bottom row)
- Top row (light color): Planned period (Planned Start – Planned Due)
- Bottom row (dark color): Actual period (Actual Start – Actual Due)
Visualizing Delays:
- Actual bar exceeds Planned → Delay detected (shown in red)
- Actual bar within Planned → On track (shown in green)
Zoom Level
Switch the Gantt chart display granularity:
- Day: Daily view (default)
- Week: Weekly aggregated view
- Month: Monthly aggregated view
🎨 Customizing Columns
Default Columns (13 Types)
PinotWalk WBS comes with 13 standard columns based on project management best practices:
| カラム名 | 型 | 説明 |
|---|---|---|
| WBS No. | text | WBS番号(例: 1.1.1) |
| Task Name | text | タスク名(必須) |
| Status | select | ステータス(未着手/進行中/完了/ブロック中) |
| Owner | user | 担当者 |
| Team | team | Team in charge |
| Planned Start | date | Planned start date |
| Planned Due | date | Planned end date |
| Actual Start | date | Actual start date |
| Actual Due | date | Actual end date |
| Planned Hours | number | Planned hours |
| Actual Hours | number | Actual hours |
| Progress | number | Progress (0–100%) |
| Notes | textarea | Notes/remarks |
Adding Columns (Coming Soon)
You can add custom columns:
- Budget column (currency):
{ type: "currency", currency: "JPY" } - Priority (select):
{ type: "select", options: ["High", "Medium", "Low"] } - URL (url):
{ type: "url" } - Email (email):
{ type: "email" }
💡 Use Cases
Software Development Project
【Phase 1】Requirements & Design
├─ User Interviews
├─ Requirements Document
├─ System Design
└─ Database Design
【Phase 2】開発
├─ バックエンド開発
│ ├─ API設計
│ ├─ 認証機能
│ └─ データベース構築
├─ フロントエンド開発
│ ├─ UI/UXデザイン
│ ├─ コンポーネント実装
│ └─ 画面遷移実装
└─ インフラ構築
【Phase 3】テスト・リリース
├─ 単体テスト
├─ 結合テスト
├─ ユーザー受入テスト
└─ 本番リリース
建設プロジェクト
【Phase 1】基本設計
├─ 地質調査
├─ 建築設計
└─ 構造設計
【Phase 2】施工
├─ 基礎工事
├─ 躯体工事
├─ 内装工事
└─ 設備工事
【Phase 3】検査・引渡し
├─ 完成検査
├─ 是正工事
└─ 引渡し
研究プロジェクト
【Phase 1】文献調査
【Phase 2】実験計画
├─ 実験デザイン
├─ 材料調達
└─ 予備実験
【Phase 3】本実験
├─ データ収集
├─ データ解析
└─ 結果検証
【Phase 4】論文執筆
├─ 初稿執筆
├─ 査読対応
└─ 最終版提出
🚀 プロの使い方(Tips)
Tip 1: WBS番号の自動採番
WBS番号(例: 1.1.1)は、階層構造から自動生成されます。
1. Phase 1 → WBS No. = "1"
1.1 要件定義 → WBS No. = "1.1"
1.1.1 ヒアリング → WBS No. = "1.1.1"
1.1.2 要件書作成 → WBS No. = "1.1.2"
1.2 設計 → WBS No. = "1.2"
2. Phase 2 → WBS No. = "2"
手動で設定する必要はありません。
Tip 2: クリティカルパスの特定
ガントチャートで、最も遅延が許されないタスク列を見つけましょう。
- 最終納期から逆算して、「このタスクが遅れたら全体が遅れる」タスクがクリティカルパス
- ActualバーがPlannedを超えているタスクに注目
Tip 3: 進捗会議での活用
週次進捗会議でWBSを画面共有:
- 完了タスク → ✅ COMPLETED に変更
- 進行中タスク → 🟠 IN_PROGRESS、Progress % を更新
- 遅延タスク → Actual Due を再設定、Notes に理由を記載
- ブロックタスク → 🔴 BLOCKED に変更、原因を記載
会議後は自動保存されるため、議事録作成不要。
Tip 4: 担当者ごとのタスク抽出
将来対応予定:
- フィルター機能で「Owner = 山田」でフィルター
- 担当者ごとのタスクリストを一覧表示
Tip 5: Excelへエクスポート(将来対応予定)
- 「Export to Excel」ボタンで
.xlsxファイルにエクスポート - 経営層への報告資料に活用
🔒 権限管理
アクセス制御
WBSファイルは、Spaceメンバーのみがアクセスできます。
- Space Member(MEMBER): 閲覧・編集可能
- Space Viewer(VIEWER): 閲覧のみ
- Space Admin(ADMIN): すべての操作が可能(削除含む)
チームへの共有
- Space詳細ページ → 「Members」タブ
- 「Add Member」ボタンをクリック
- 追加したいユーザーを選択
- 役割を選択(ADMIN / MEMBER / VIEWER)
- 追加完了
📊 なぜPinotWalk WBSを使うべきか?
❌ 従来のツールの問題点
| ツール | 問題点 |
|---|---|
| Excel | ・ガントチャートは手作業で描画 ・バージョン管理が煩雑(ファイル添付メール地獄) ・複数人で同時編集できない |
| MS Project | ・高額(年間7万円〜) ・操作が複雑(習得に時間がかかる) ・クラウド共有が不便 |
| Asana/Trello | ・WBS形式ではない(カンバン方式) ・階層構造が弱い ・ガントチャートが有料プラン限定 |
✅ PinotWalk WBSの優位性
| 特徴 | メリット |
|---|---|
| 🆓 完全無料 | 追加課金なし、すべての機能が使い放題 |
| 🚀 5分で使える | 難しい設定不要、ドラッグ&ドロップで即スタート |
| 💼 プロ仕様 | 大手企業のPMO基準に準拠した13カラム |
| 🌐 どこでもアクセス | ブラウザだけで動作、インストール不要 |
| 👥 リアルタイム共有 | チームメンバー全員が同じ画面を見ながら議論 |
| 🔓 オープンフォーマット | .wbs (JSON) 形式、将来的に他ツールへ移行可能 |
| 📈 ガントチャート自動生成 | 日付を入力するだけで、自動的に図示 |
🔧 トラブルシューティング
Q1: Excelファイルをアップロードしても変換できない
原因:
- Excelファイルに「タスク名」カラムがない
- シートが空、またはデータがない
解決方法:
- Excelファイルを開く
- 「タスク名」「Task Name」「項目」などのカラムが存在するか確認
- 最低1行以上のデータが入力されているか確認
- 再度アップロード
Q2: ガントチャートが表示されない
原因:
- 開始日・終了日が入力されていない
解決方法:
- 少なくとも1つのタスクに「Planned Start」と「Planned Due」を入力
- ページをリロード
Q3: 階層が正しく認識されない
原因:
- Excelのインデントが認識されていない
解決方法:
- タスク名の前に【】を使って親タスクを明示:
【Phase 1】 子タスク 【Phase 2】
Q4: ファイルサイズが大きすぎてアップロードできない
制限:
- WBSファイル: 10MB まで
- Excelファイル: 10MB まで
解決方法:
- 不要なシートを削除
- 画像・グラフを削除
- プロジェクトを複数のWBSファイルに分割
📚 関連リソース
ユーザー向け
開発者向け
オープンソース
.wbsフォーマット仕様: MITライセンスで公開予定- wbs-format ライブラリ: PyPIで配布予定(
pip install wbs-format) - wbs-editor コンポーネント: npmで配布予定(
npm install wbs-editor)
💬 フィードバック
WBS機能について、ご意見・ご要望がありましたら:
- PinotWalk内の「フィードバック」機能から送信
- GitHubのIssueで報告: GitHub Issues
- チーム管理者に相談
あなたのフィードバックが、次のアップデートに反映されます。
最終更新: 2026-02-14
🎓 まとめ
PinotWalk WBSを使えば、プロジェクト管理が驚くほど簡単になります。
✅ 5分で使える 直感操作
✅ プロ仕様 の13カラム & ガントチャート
✅ 完全無料、追加課金なし
✅ チーム全員で共有 できる
今すぐ始めましょう!
- Spaceページに移動
- 「Files」タブを開く
- ExcelファイルをアップロードするだけWBSで、あなたのプロジェクトを成功に導きましょう。
Comments