WBS (Work Breakdown Structure)
Project management made incredibly simple.
Creating a WBS (Work Breakdown Structure) used to require Excel or MS Project. With PinotWalk, it's all done in your browser.
With intuitive drag-and-drop operations, anyone can create a professional project plan in just 5 minutes.
๐ What is WBS?
Work Breakdown Structure is a methodology for breaking down projects into smaller tasks and managing them hierarchically.
Why Do You Need WBS?
- โ Visualize Progress: See task completion status at a glance
- โ Prevent Oversights: Breaking down the whole prevents missed tasks
- โ Clear Role Assignment: Manage who does what by when in one view
- โ Schedule Management: Visualize timelines with Gantt charts
PinotWalk WBS Features
| Feature | Description | Difference from Traditional Tools |
|---|---|---|
| ๐ Incredibly Easy | Edit cells like Excel | No complex setup like MS Project |
| ๐ผ Professional Grade | Compliant with enterprise PMO standards | Consultant-quality output |
| ๐ Built-in Gantt Chart | Schedules automatically visualized | Excel requires manual drawing |
| ๐ Open Format | Saved as .wbs (JSON) |
No vendor lock-in |
| ๐ฅ Team Sharing | All Space members can view in real-time | No more email attachments |
๐ฏ What You Can Do
โ Basic WBS Functions
- Hierarchical Task Management (Parent Task โ Child Task โ Grandchild Task...)
- 13 Column Types (Text, Date, User, Status, Progress Rate, Hours, etc.)
- Status Management (Not Started / In Progress / Completed / Blocked)
- Progress Visualization (Progress bar display)
- Assignee Assignment (User selection available)
โ Gantt Chart (Calendar View)
- Parallel Display of Planned and Actual
- Automatic Calendar Range Calculation (Earliest start to latest end date)
- Two-tier Month/Day Header (YYYY-MMM format)
- Task Bar Visualization (Light blue = Planned, Dark color = Actual)
- Milestone Display (Highlight important milestones)
๐ค Creating a WBS File
- Creating a WBS means you probably have a project and are involved in its management.
- You'll likely create a Team to centrally manage the project and a Space for planning and managing the WBS and other project activities.
- On the Space screen, you'll find the [+WBS] button right next to the Files title on the left side.
- This button opens up the world of WBS!
How to: Create a New WBS
-
Navigate to the Space Page
- Team detail page โ Spaces tab โ Click on your target Space
-
Open the Files Tab
- Click on the "Files" tab
-
Click "+WBS"
- Once the WBS opens, you can start editing in an Excel-like interface.
๐ How to Use the WBS Viewer
Basic Screen Layout
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ WBS: Project Name ๐ Stats Panel โ
โ โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ โ
โ โโโโโโโโโโโโฌโโโโโโโฌโโโโโโโฌโโโโโโโโโฌโโโโโโโฌโโโโโโโโโโโโโโโโโโ โ
โ โTask Name โStatusโOwner โStart โEnd โ Gantt Chart โ โ
โ โโโโโโโโโโโโผโโโโโโโผโโโโโโโผโโโโโโโโโผโโโโโโโผโโโโโโโโโโโโโโโโโโค โ
โ โ โผ Phase1 โDone โYamadaโ01/15 โ02/28 โโ โ โ โ โ โ โ โ โ โ โ โ
โ โ Req.DefโDone โSuzukiโ01/15 โ01/31 โ โ โ โ โ โ โ
โ โ Design โDone โSato โ02/01 โ02/28 โ โ โ โ โ โ โ โ โ
โ โ โผ Phase2 โWIP โTanakaโ03/01 โ05/31 โ โโโโ โ โ
โ โ Dev โWIP โTakahaโ03/01 โ04/30 โ โ โ โ โ โ
โ โ Test โTo Do โWatanaโ05/01 โ05/31 โ โ โ
โ โโโโโโโโโโโโดโโโโโโโดโโโโโโโดโโโโโโโโโดโโโโโโโดโโโโโโโโโโโโโโโโโโ โ
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
Stats Panel
Displays an overview of the entire WBS:
- Total Tasks: Total number of tasks
- Root Tasks: Number of top-level tasks (tasks without a parent)
- Max Depth: Depth of hierarchy (maximum number of levels)
- Columns: Number of columns
Tree View Operations
Expand/Collapse Tasks
- Click โผ button โ Show/hide child tasks
- Expand All โ Click "Expand All" button at the top
- Collapse All โ Click "Collapse All" button at the top
Status Badges
Task status is displayed with colors:
| Status | Display | Color |
|---|---|---|
| Completed | COMPLETED | ๐ข Green |
| In Progress | IN_PROGRESS | ๐ Orange |
| Not Started | NOT_STARTED | โช Gray |
| Blocked | BLOCKED | ๐ด Red |
Progress Bar
Task progress is displayed visually:
0% โโโโโโโโโโ (empty)
25% โโโโโโโโโโ (light blue bar)
50% โโโโโโโโโโ
75% โโโโโโโโโโ
100% โโโโโโโโโโ (dark bar)
๐ Gantt Chart Features
Calendar View
Two-Row Header Structure
โโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโโ
โ 2026-Jan โ 2026-Feb โ
โโโโฌโโโฌโโโฌโโโฌโโโฌโโโฌโโโฌโโโฌโโโผโโโฌโโโฌโโโฌโโโฌโโโฌโโโฌโโโฌโโโฌโโโค
โ 1โ 2โ 3โ 4โ 5โ...โ30โ31โ โ 1โ 2โ 3โ 4โ...โ27โ28โ โ
โโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโดโโโ
- Row 1: Month header (YYYY-MMM format, e.g., 2026-Jan)
- Row 2: Dates (1โ31)
Understanding Task Bars
Planned and Actual shown in parallel:
Planned: โโโโโโโโโโโโโโ (light color, top row)
Actual: โโโโโโโโโโ (dark color, bottom row)
- Top row (light color): Planned period (Planned Start โ Planned Due)
- Bottom row (dark color): Actual period (Actual Start โ Actual Due)
Visualizing Delays:
- Actual bar exceeds Planned โ Delay detected (shown in red)
- Actual bar within Planned โ On track (shown in green)
Zoom Level
Switch the Gantt chart display granularity:
- Day: Daily view (default)
- Week: Weekly aggregated view
- Month: Monthly aggregated view
๐จ Customizing Columns
Default Columns (13 Types)
PinotWalk WBS comes with 13 standard columns based on project management best practices:
| ใซใฉใ ๅ | ๅ | ่ชฌๆ |
|---|---|---|
| WBS No. | text | WBS number (e.g., 1.1.1) |
| Task Name | text | Task name (required) |
| Status | select | Status (Not Started / In Progress / Completed / Blocked) |
| Owner | user | Assignee |
| Team | team | Team in charge |
| Planned Start | date | Planned start date |
| Planned Due | date | Planned end date |
| Actual Start | date | Actual start date |
| Actual Due | date | Actual end date |
| Planned Hours | number | Planned hours |
| Actual Hours | number | Actual hours |
| Progress | number | Progress (0โ100%) |
| Notes | textarea | Notes/remarks |
Adding Columns (Coming Soon)
You can add custom columns:
- Budget column (currency):
{ type: "currency", currency: "JPY" } - Priority (select):
{ type: "select", options: ["High", "Medium", "Low"] } - URL (url):
{ type: "url" } - Email (email):
{ type: "email" }
๐ก Use Cases
Software Development Project
ใPhase 1ใRequirements & Design
โโ User Interviews
โโ Requirements Document
โโ System Design
โโ Database Design
ใPhase 2ใDevelopment
โโ Backend Development
โ โโ API Design
โ โโ Authentication
โ โโ Database Setup
โโ Frontend Development
โ โโ UI/UX Design
โ โโ Component Implementation
โ โโ Screen Navigation
โโ Infrastructure Setup
ใPhase 3ใTesting & Release
โโ Unit Testing
โโ Integration Testing
โโ User Acceptance Testing
โโ Production Release
Construction Project
ใPhase 1ใBasic Design
โโ Geological Survey
โโ Architectural Design
โโ Structural Design
ใPhase 2ใConstruction
โโ Foundation Work
โโ Structural Work
โโ Interior Work
โโ Facility Installation
ใPhase 3ใInspection & Handover
โโ Completion Inspection
โโ Remediation Work
โโ Handover
Research Project
ใPhase 1ใLiterature Review
ใPhase 2ใExperiment Planning
โโ Experiment Design
โโ Material Procurement
โโ Preliminary Experiment
ใPhase 3ใMain Experiment
โโ Data Collection
โโ Data Analysis
โโ Result Verification
ใPhase 4ใPaper Writing
โโ First Draft
โโ Peer Review Response
โโ Final Submission
๐ Pro Tips
Tip 1: Automatic WBS Numbering
WBS numbers (e.g., 1.1.1) are automatically generated from the hierarchy.
1. Phase 1 โ WBS No. = "1"
1.1 Requirements โ WBS No. = "1.1"
1.1.1 Interviews โ WBS No. = "1.1.1"
1.1.2 Spec Document โ WBS No. = "1.1.2"
1.2 Design โ WBS No. = "1.2"
2. Phase 2 โ WBS No. = "2"
No manual setup required.
Tip 2: Identify the Critical Path
Use the Gantt chart to find the sequence of tasks with zero slack.
- Work backwards from the final deadline to identify "if this task slips, the whole project slips"
- Watch for tasks where Actual bar exceeds Planned
Tip 3: Use in Progress Meetings
Share WBS in weekly progress meetings:
- Completed tasks โ Change to โ COMPLETED
- In-progress tasks โ ๐ IN_PROGRESS, update Progress %
- Delayed tasks โ Reset Actual Due, add reason in Notes
- Blocked tasks โ Change to ๐ด BLOCKED, note the cause
Auto-saves after the meeting โ no need to write meeting minutes.
Tip 4: Filter by Owner
Coming soon:
- Filter by "Owner = Yamada"
- Display task list per assignee
๐ Access Control
Permissions
WBS files are accessible only to Space members.
- Space Member (MEMBER): View & edit
- Space Viewer (VIEWER): View only
- Space Admin (ADMIN): Full access (including delete)
Sharing with Team
- Go to Space details โ "Members" tab
- Click "Add Member"
- Select the user to add
- Choose role (ADMIN / MEMBER / VIEWER)
- Done
๐ Why Use PinotWalk WBS?
โ Problems with Traditional Tools
| Tool | Issues |
|---|---|
| Excel | ใปGantt charts require manual drawing ใปVersion control is chaotic (email attachment hell) ใปNo simultaneous multi-user editing |
| MS Project | ใปExpensive (USD 700+/year) ใปComplex UI (steep learning curve) ใปCloud sharing is inconvenient |
| Asana/Trello | ใปNot WBS format (Kanban style) ใปWeak hierarchical structure ใปGantt charts only in paid plans |
โ PinotWalk WBS Advantages
| Feature | Benefit |
|---|---|
| ๐ Completely Free | No additional charges, all features available |
| ๐ Ready in 5 Minutes | No complex setup, drag & drop to start immediately |
| ๐ผ Professional Grade | 13 columns compliant with enterprise PMO standards |
| ๐ Access Anywhere | Works in browser only, no installation required |
| ๐ฅ Real-time Sharing | All team members can view and discuss the same screen |
| ๐ Open Format | .wbs (JSON) format, easily migrate to other tools in the future |
| ๐ Auto-generated Gantt Chart | Just enter dates, visualization is automatic |
๐ง Troubleshooting
Q1: Gantt Chart Not Displaying
Cause:
- Start date and end date are not entered
Solution:
- Enter "Planned Start" and "Planned Due" for at least one task
- Reload the page
Q2: File Size Too Large to Upload
Limit:
- WBS file: Up to 10MB
Solution:
- Delete unnecessary sheets
- Remove images and charts
- Split the project into multiple WBS files
๐ Related Resources
For Users
For Developers
Open Source
.wbsFormat Specification: To be released under MIT License- wbs-format Library: To be distributed on PyPI (
pip install wbs-format) - wbs-editor Component: To be distributed on npm (
npm install wbs-editor)
๐ฌ Feedback
If you have any opinions or requests about the WBS feature:
- Submit via the "Feedback" function within PinotWalk
- Consult your team administrator
Your feedback will be reflected in future updates.
ๆ็ตๆดๆฐ: 2026-02-14
๐ Summary
With PinotWalk WBS, project management becomes incredibly simple.
โ
Ready in 5 minutes with intuitive operations
โ
Professional grade 13 columns & Gantt chart
โ
Completely free, no additional charges
โ
Share with your entire team
Let's get started now!
- Navigate to the Space page
- Open the "Files" tab
- Just upload an Excel file โ let WBS lead your project to success.